Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73548 REL 91: 2007-224-00 EXP CCT METHOW RESTORATION
Project Number:
Title:
Okanogan Subbasin Habitat Implementation Program (OSHIP)
Stage:
Complete
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73548 REL 91
Contract Title:
2007-224-00 EXP CCT METHOW RESTORATION
Contract Continuation:
Previous: Next:
73548 REL 65: 2007-224-00 EXP CCT METHOW RESTORATION
Contract Status:
Closed
Contract Description:
CCR-45293:

Through this contract action the following changes are proposed:

-Extend contract end date to October 31, 2021
-WE milestones rescheduled to align with updated contract end date
-Reschedule  $150,000 from 2016, project 2007-224-00
-Reschedule  $250,000 from 2017, project 2007-224-00
-LWD Procurement has been added as WE Q
-WE budgets were adjusted accordingly
-Line Item Budget associated with this Release, has been modified to reflect changes in work


This contract is to conduct aquatic habitat improvement projects in the Methow Subbasin.  Projects to be implemented will primarily emphasize benefits to ESA listed spring Chinook, summer steelhead, and bull trout and secondarily to other salmonids and Pacific lamprey.  Work will include regular attendance of coordination meetings with project sponsors and oversight groups to ensure that work is conducted consistent with established needs and in coordination with other existing restoration efforts.

Projects prioritization is based on the 2014 EDT model run for the Methow Subbasin and the 2017 Regional Technical Team Biological Strategy.    

Work under this contract cycle will include:

•    Devany side channel reconnection: Design
•    Upper Twisp River LW supplementation: Design
•    Little Bridge Creek BDA and LW supplementation:  Design
•    Lower Beaver Creek enhancement:  Design
•    Hwy 20 remove riprap and install LW:  Design
•    Wolf Creek LW supplementation:  Produce plan
•    Methow River install LW at RM 54–56:  Produce plan
•    Newby Creek levee removal and install LW:  Design
•    Ben Canyon Creek culvert:  Implementation
•    Chewuch Road decommissioning:  Produce plan/ Implementation
•    Texas Creek BDA installation:  Implementation

Additionally, CTCR will continue supporting public outreach and educate for local students and the general public about the importance of salmon recovery and habitat improvement in the Methow Valley.

Cultural resource surveys as required under Section 106 of the NHPA, unless previously completed prior to this contract period, will be completed by the Colville Confederated Tribes Cultural Resource staff.

CTCR staff funding allocated under this contract are for: Matt Young (CTCR Methow Contract Manager - contract management); an Engineer (TBD, design review); and field technician staff are used as available to assist in field work.  Field work to be conducted during this contract period include installing Beaver Dam Analogs (BDAs), pre-site assessments, and other data gathering activities to aid in project development.  
    
The contractor (CTCR), its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, and integration of input and comments from BPA).

CTCR Contract Manager and design consultants will cooperate, coordinate, collaborate, and maintain effective communication with BPA PM/COR, EC Lead, and BPA ETS, during the entire length of this design contract. CTCR and its subcontractors will address BPA comments and concerns, and the two entities will arrive at a mutual beneficial consensus.
Account Type(s):
Expense
Contract Start Date:
07/01/2020
Contract End Date:
10/31/2021
Current Contract Value:
$991,767
Expenditures:
$991,767

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation B: 165. Produce Compliance Documentation 10/31/2021 09/30/2021
Methow Restoration Project Management C: 119. Project Management 10/31/2021 09/30/2021
Watershed coordination D: 191. Methow Subbasin Coordination 10/31/2021 09/30/2021
Prioritized Project List E: 114. Project Identification and Selection Process & Coordination w/BPA 02/10/2021 02/10/2021
Devany Side Channel/Aquatic Complexity Project Final Design F: 175. Devany Side Channel/Aquatic Complexity Project Design 10/31/2021 09/30/2021
Upper Twisp LWD Supplementation design G: 175. Upper Twisp LW supplementation 10/31/2021 09/30/2021
Little Bridge Creek LWD and BDA Design H: 175. Little Bridge Creek BDA & LW 06/30/2021 06/30/2021
Produce plan for a habitat enhancement project on the Methow River, RM 54-56. J: 174. Methow River enhancement RM 54-56 10/31/2021 09/30/2021
Install Fish passage structure L: 184. Ben Canyon Creek Road Culvert Replacement Project construction 09/30/2021
Install BDAs in Texas Creek M: 55. Texas Creek BDA 09/30/2021
Methow Valley Outreach and Education Annual Report N: 99. Methow Valley Public Outreach 06/30/2021 06/30/2021
Cultural Resource Surveys for Habitat Improvement Projects O: 165. Cultural Resource Surveys 10/31/2021 09/30/2021
Completed Annual Report under CR:338930 P: 132. No report is required per COR 10/31/2021 06/30/2021
Procure 600 pieces of large wood Q: 29. Procure LW for the Twisp River LW supplimentation projects (WE- G & H) 10/31/2021 09/30/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
  • 4 instances of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
  • 4 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Produce Compliance Documentation
C 119 Project Management
D 191 Methow Subbasin Coordination
E 114 Project Identification and Selection Process & Coordination w/BPA
F 175 Devany Side Channel/Aquatic Complexity Project Design
G 175 Upper Twisp LW supplementation
H 175 Little Bridge Creek BDA & LW
I 174 Lower Beaver Creek enhancement
J 174 Methow River enhancement RM 54-56
K 175 Newby Creek project
L 184 Ben Canyon Creek Road Culvert Replacement Project construction
M 55 Texas Creek BDA
N 99 Methow Valley Public Outreach
O 165 Cultural Resource Surveys
P 132 No report is required per COR
Q 29 Procure LW for the Twisp River LW supplimentation projects (WE- G & H)